Subdivision developmentsConcept
Options and layers

Design options

Cul-de-sacs, a lot sooner

Piopio Lane carried into the block with each cul-de-sac started a lot sooner, so the lots round each head are full sections. The reserve stays in the south, which departs from the ODP stormwater area.

Build stages

Build, in the bar along the foot of the view, opens a timeline: slide through it, or press Play and let it run. ↑ ↓ step the stages and space plays. Durations are illustrative.

Concept only. The setting is real public data; the boundary is indicative and the 30-lot layout to come is hypothetical, not a consented subdivision or an engineering design. Terrain: LINZ Christchurch LiDAR 1 m (NZVD2016, CC BY 4.0); imagery: LINZ Christchurch 0.075 m Urban Aerial Photos (CC BY 4.0); buildings and streets © OpenStreetMap contributors (ODbL) with LiDAR heights; trees from the LiDAR canopy.

Loading terrain, imagery and the neighbourhood…